Developing an Instrument for Knowledge Management Project Evaluation
Keywords:
Knowledge management, Evaluation process, Measurement instrument, Success factorsAbstract
Many knowledge management (KM) projects have been initiated, some of which have been successes but many have been failures. Measuring the success or failure of KM initiatives is not easy, and in order to do so some kind of measurement process has to be available. There are three points at which evaluation of KM projects can, and should be, done: (1) when deciding whether to start and where to focus, (2) once under way, following up on a project and making adjustments if needed, and (3) when completed, to evaluate the project outcomes. This paper concentrates on the first two areas by developing a general instrument for evaluation of KM projects.Downloads
Published
Issue
Section
License
Open Access Publishing
The Electronic Journal of Knowledge Maangement operates an Open Access Policy. This means that users can read, download, copy, distribute, print, search, or link to the full texts of articles, crawl them for indexing, pass them as data to software, or use them for any other lawful purpose, without financial, legal, or technical barriers other than those inseparable from gaining access to the internet itself. The only constraint on reproduction and distribution, and the only role for copyright in this domain, is that authors control the integrity of their work, which should be properly acknowledged and cited.